In the electricity sector, the group participated in the development of the following projects:

  • Two 320 MW (US $ 80 million) thermoelectric generation units.
  • 80 MW steam turbine and HRSG in a 400 MW combined cycle (US $ 80 million).
  • Two used 200 MW thermoelectric generation units (US $ 30 million).
  • Supply, installation and commissioning of vibration monitoring equipment in five hydroelectric power plants.
  • Three gas turbines of approximately 170 MW each.